News

Media contact person

Press Corner

News from the Mayr-Melnhof Holz Group

Share post:
Linkedin Instagram
Mayr-Melnhof Holz Reuthe, 18. June 2024

Ecological power supply with photovoltaics

Sustainability is our principle, which is why we use solar power for our plants in Leoben, Gaishorn, Reuthe, Paskov, Wismar and Olsberg. Mayr-Melnhof Holz is investing 13 million euros in an ecological power supply for a greener future. The plants are now being put into operation step by step.


After an installation period of around 7 months, the location Reuthe (Vorarlberg) is now ready. A total of 4,780 panels were installed on the production and storage halls, which are now generating green electricity for the company's own consumption. The output totals 1,808.80 KWp and is a further step towards an environmentally friendly and sustainable production.

In Reuthe, Mayr-Melnhof Holz produces glulam MM masterline, glulam special components and formwork products.
220 people are employed at the location.

Fact overview photovoltaic system MM Holz Reuthe:
 

Location

Mayr-Melnhof Holz Reuthe

Number of panels 

4,780

Output

1,808.80 KWp

Installation period 

7 months

Commissioning 

May 2024

 

Photos: © Mathias Simma

Your media relations contact person

CONTACT